Award of Contracts 2022 |
|||
TOTAL $120,876,977.35
|
|||
PROJECT NAME | PROCURING ENTITY |
Awarded to | Amount (EC) |
Lauriston Restoration and Rehabilitation Project – Lauriston Carriacou |
The Ministry of Economic Development, Planning, Tourism, ICT, Creative Economy, Agriculture and Land Fisheries & cooperatives Enhanced Direct Access Project - Green Climate Fund |
D&U and Zeeland |
$ 125,550 USD |
Lauriston Restoration and Rehabilitation Project – Lauriston Carriacou |
The Ministry of Economic Development, Planning, Tourism, ICT, Creative Economy, Agriculture and Land Fisheries & cooperatives Enhanced Direct Access Project - Green Climate Fund |
Roberts Caribbean | $ 61,600 USD |
Lauriston Restoration and Rehabilitation Project – Lauriston Carriacou |
The Ministry of Economic Development, Planning, Tourism, ICT, Creative Economy, Agriculture and Land Fisheries & cooperatives Enhanced Direct Access Project - Green Climate Fund |
Grenada Fund for Conservation |
$ 68,000 USD |
Construction of a retaining wall at Hope St. Andrew's | Ministry of Infrastructure Development | David Jeremiah | $ 178,660.00 |
Rehabilitation of Robert Street, La Mode St. Patrick | Ministry of Infrastructure Development | Russell Lewish | $ 167,736.50 |
Construction of roof on La Borie mini pavillion | Ministry of Infrastructure Development | Ryan Murrell | $ 221,657.13 |
Construction of pavement at Dunfermline, St. Andrew's | Ministry of Infrastructure Development | Trevor Booker | $ 148,364.68 |
Construction of retaining wall at Karland Park, Grand Anse St. George's |
Ministry of Infrastructure Development | Christopher Alexis | $ 279,168.25 |
Rehabilitation of Mt. Rodney Road, St. Patrick | Ministry of Infrastructure Development | Percy Edwards | $ 213,376.50 |
Construction of pavement and slipper drain, access to property and kerb wall at Jumbie Road, Tempe St. George |
Ministry of Infrastructure Development | Michael Cumming | $ 455,688.20 |
Construction of concrete pavement and box drain at Crochu, St. Andrew's |
Ministry of Infrastructure Development | Wayne Celestine | $ 114,282.66 |
Construction of concrete pavement at Café, St. George | Ministry of Infrastructure Development | Carim Arnold | $ 216,385.15 |
Construction of box drain at Plaisance, St. Andrew's | Ministry of Infrastructure Development | David Buckmire | $ 115,980.00 |
Construction of salon road, concrete pavement, culvert, box and slipper driain at Marquis, St. Andrew's | Ministry of Infrastructure Development | Vernon Job | $ 209,636.50 |
Construction of concrete pavement, culvert, box and slipper drain at Tuilleries, St. Andrew's | Ministry of Infrastructure Development | David Noel | $ 241,180.10 |
Construction of Baghdad pavement, slipper drain, swale and kerb wall at River Sallee, St. Patrick's | Ministry of Infrastructure Development | Leron James | $ 107,800.50 |
Construction of concrete pavement, slipper drain, swale and head wall at Rose Hill, St. Patrick's | Ministry of Infrastructure Development | Harrold Flanders | $ 132,553.00 |
Construction of concrete pavement, box and slipper drain and culvert at Point Bowl, St. Patrick's | Ministry of Infrastructure Development | Peter Lawrence | $ 336,499.00 |
Rehabilitation of Reliance Road, Mt. Reuil, St. Patrick's | Ministry of Infrastructure Development | Micky Alexander | $ 178,454.50 |
Rehabilitation of Kent Drive Road, Bathway, St. Patrick's | Ministry of Infrastructure Development | Martin Roberts | $ 131,345.00 |
Additional works on Mt. Hartman Road, St.George | Ministry of Infrastructure Development | David Benjamin | $ 219,562.39 |
Repair and addition to existing facilities works at Grand Bacolet Juvenile Rehabilitation Center | Ministry of Infrastructure Development | Adrian Gabriel | $ 923,755.26 |
Construction of Seamoon Cultural Center | Ministry of Infrastructure Development | Kenny's Equipment and Trucking Services | $ 23,949,868.40 |
Construction of retaining wall and pavement at Grand Roy, St. John | Ministry of Infrastructure Development | Junior Farray | $ 117,241.30 |
Construction of Beausejour Steel Bridge, Beausejour, St. George | Ministry of Infrastructure Development | George Wilkinson | $ 588,769.25 |
Construction of temporary structure to house the school - St. Andrews Anglican Primary School | Ministry of Infrastructure Development | Neville Matthew | $ 843,354.36 |
Repair works on St. George's Seventh Day Adventist School, Archibald Av. St. George's | Ministry of Infrastructure Development | Moses Alexander | $ 425,119.18 |
Renovation of food and nutriton building, The Villa, St. George's | Ministry of Infrastructure Development | Michael Seales | $ 632,295.30 |
Repair works at Springs Government School | Ministry of Infrastructure Development | Gordon Paul | $ 546,726.04 |
Construction of Mt. Nesbit Bridge | Ministry of Infrastructure Development | Junior Farray | $ 166,535.93 |
Repair works at St. Andrew's Anglican Secondary School | Ministry of Infrastructure Development | Adrian Gabriel | $ 747,509.95 |
Construction of toilet block at the temporary location of St. Andrew's Anglican Primary School | Ministry of Infrastructure Development | Neville Matthew | $ 316,190.66 |
Construction of Pavement and drains at Calata road, Darbeau, St. George | Ministry of Infrastructure Development | Valista Francis | $ 587,007.30 |
Construction of Victoria Medical Station | Ministry of Infrastructure Development | Addington John | $ 853,949.98 |
Rehabilitation of Dixie Road, St. George | Ministry of Infrastructure Development | Marcus Christopher | $ 241,473.55 |
Construction of retaining wall at Mt. Airy, St. George | Ministry of Infrastructure Development | Peter Austin | $ 545,070.41 |
Installation of a sign board in Petite Martinique | Carriacou and Petite Martinique Affairs | Sister Isle Media | $ 328,900.00 |
Repair works on the Hermitage Government School | Ministry of Infrastructure Development | Wayne Smart | $ 190,734.99 |
Construction of the Grenville Commercial Complex | Ministry of Infrastructure Development | Kee Chanona/Sonrise Construction Company | $ 18,768,960.19 |
Supply of Lighting equipment required for the lighting of 13 playing fields | Ministry of Infrastructure Development | Solar LED Lighting Company, China | $ 2,398,520.07 |
Resurfacing of pavement at Old Shed 3 Building | Grenada Ports Authority | Kenny's Equipment and Trucking Services | $ 162,141.40 |
Conducting renovation works at L'Esterre Rosary School | Ministry of Infrastructure Development | Bernard Lendore | $ 371,815.00 |
Lighting of 13 playing fields throughout Grenada | Ministry of Infrastructure Development | Grid Free Solution Inc | $ 1,892,928.09 |
Construction of storm drain at Grand Mal, St. George | Ministry of Infrastructure Development | Matthew U. Thomas | $ 599,945.50 |
Construction of box culvert and pavement at Bay Ruth Road, Tempe, St. George | Ministry of Infrastructure Development | Romero Donald | $ 306,765.41 |
Construction of Cattle Shed at Mirabeau, St. Andrew's | Ministry of Infrastructure Development | Ray Wickham | $ 501,878.80 |
Construction of upper cocoa road, Marian, St. George's | Ministry of Infrastructure Development | Randolph Vincent | $ 217,453.60 |
Construction of drains and pavement at Vendomme, St. George | Ministry of Infrastructure Development | Cecil Cambridge | $ 407,395.38 |
Repairs to Staffroom and construction of block wall at Happy Hill Secondary School | Ministry of Infrastructure Development | Nickson Victor | $ 680,187.74 |
Construction of Lower Cocoa Road, Marian, St. George | Ministry of Infrastructure Development | Ray Charles | $ 139,138.50 |
Extension of the Technical Block at Happy Hill Secondary School | Ministry of Infrastructure Development | Raymond Patrick | $ 725,792.18 |
Extension of the Tuck shop, and repairs to toilet facilities at Happy Hill Secondary School | Ministry of Infrastructure Development | David John | $ 137,266.35 |
Consultancy Services for the Design and supervision relating to the construction of Bonaire Bridge | Basic Needs Trust Fund | FDL Consult Inc. St. Lucia | $ 312,397.50 |
Provision of Engineering Design and supervision services relating to construction of Lots 2 & 3, Farm Road Access | Ministry of Infrastructure Development | SAFED Inc | $ 487,915.64 |
Supply, Delivery and Installation of an X-ray Inspection System at the St. George's Port | Grenada Ports Authority | SECTUS Technologies | $ 727,585.82 |
Construction of pavement and drains at Chantilly Road, La Mode, St. George | Ministry of Infrastructure Development | Paving Solution Inc. | $ 747,560.35 |
Rehabilitation of Moliniere Landslip Project | Ministry of Infrastructure Development | Construction and Industrial Equipment Ltd | $ 12,777,537.30 |
Construction of concrete storm drain at Coca Road at Grand Mal, St. George | Ministry of Infrastructure Development | Cecil Patrick | $ 661,640.03 |
Construction of a retaining wall at Rose Cottage, Mt. Moritz St. Goerge | Ministry of Infrastructure Development | Matthew Thomas | $ 796,158.92 |
Construction of pavements and drains at Shaitay Road, Happy hill, St.George | Ministry of Infrastructure Development | Kennie Newton | $ 132,308.40 |
Construction of pavements and drains at Darbeau, St.George | Ministry of Infrastructure Development | Felix Charles | $ 242,027.16 |
Construction of concrete bridge at Kaey'eh, Molinere St. George | Ministry of Infrastructure Development | Roy Pascal | $ 134,274.69 |
Construction of box drain along Mt. Parnassus Main Road, St. George | Ministry of Infrastructure Development | Richard Braveboy | $ 224,221.80 |
Rehabilitation of Morne Delice/ Westerhall Heights, St. Davids | Ministry of Infrastructure Development | Peter Francis | $ 332,309.86 |
Conducting repair works at St. Paul's Government School | Ministry of Infrastructure Development | Henry Bill Marryshow | $ 768,670.25 |
Construction of office at the Maurice Bishop International Airport | Ministry of Infrastructure Development | Michael Seales | $ 369,818.99 |
Repairs and extension of the administration building, Happy hill Secondary School, St. George | Ministry of Infrastructure Development | Raymond Patrick | $ 984,622.54 |
Construction of Pavillion at Palms Playing field, Birchgrove, St. Andrews | Ministry of Infrastructure Development | Keith Bariteau | $ 206,130.00 |
Construction of retaining wall at Post Royal, St. Andrew's | Ministry of Infrastructure Development | Danny's Construction | $ 686,773.30 |
Repair works at the St.Louis R.C. School | Ministry of Infrastructure Development | Leroy Charles | $ 701,287.71 |
Rehabilitation of Sauteurs Fish Market | Ministry of Infrastructure Development | Carlos Wickham | $ 582,025.74 |
Construction of Morne Rouge by-road, Grand Anse, St. George | Ministry of Infrastructure Development | Dave Benjamin | $ 226,849.00 |
Construction of Pavement, Drains, Steps and retaining wall at Mitchel's Lane, St. George | Ministry of Infrastructure Development | Leroy Charles | $ 432,649.55 |
Repair works on the Grenada Boys Secondary School | Ministry of Infrastructure Development | Leon Ackie | $ 310,090.08 |
Supply and Implementation of an off the shelf tax system at the inland revenue division | Bearing Point, the Netherlands | $ 12,195,680.00 | |
Waltham Fisheries Infrastructure Improvement Project | Ministry of Infrastructure Development | Land and Marine Construction Services | $ 4,777,700.00 |
Construction of concrete pavement at Village roadd, Grand Mal, Sy. George | Ministry of Infrastructure Development | Robert Edwards | $ 236,220.00 |
Rehabilitation of Non-Pariel road, St. Mark's, | Ministry of Infrastructure Development | Kurt Mc Queen | $ 230,407.00 |
Construction of Barracks at SSU Camp, Point Saline | Ministry of Infrastructure Development | Seales Construction | $ 2,243,382.94 |
Construction of Slipper and Box drain, walkways and driveways at Coast Guard, St. Mark | Ministry of Infrastructure Development | Sewlyn Peters | $ 332,244.50 |
Renovation of La Borie Community Center | Ministry of Infrastructure Development | Jarvel Vincent | $ 260,874.30 |
Supply and delivery of high mast lighting fixture | Grenada Ports Authority | Patience Purchasing Agency | $ 127,232.42 |
Supply and delivery of desktop computers and accessories for the Ministry of Health | Ministry of Infrastructure Development | Ailsecom | $ 543,204.00 |
Repair works on Boca Secondary school | Ministry of Infrastructure Development | B.P Construction services | $ 523,836.38 |
Construction of retaining wall at Mt. Moritz, St. George's | Ministry of Infrastructure Development | Kennie Newton | $ 233,126.33 |
Construction of concrete pavement, slipper and box drains at Bells Road, St. James, St. Andrews | Ministry of Infrastructure Development | Arthur Chasteau | $ 181,621.90 |
Construction of retaining wall at Mt. Parnassus, St. George | Ministry of Infrastructure Development | Ronney Thomas | $ 267,897.91 |
Construction of concrete pavement and drains atCalivigny, St. George's | Ministry of Infrastructure Development | Leslie Baptiste | $ 237,242.24 |
Construction of concrete pavement, drains and retaining wall at Mt. Parnassus, St. George | Ministry of Infrastructure Development | kevon Francis | $ 775,976.30 |
Construction of drains, culverts, kerbs and pavement at Telescope, St. Andrews | Ministry of Infrastructure Development | Eulyn Bonaparte | $ 150,303.10 |
Renovation of Westerhall Medical Station, St. David's | Ministry of Infrastructure Development | Kelly Clyne | $ 311,688.30 |
Construction of Whisper Cove Road, Woburn, St. George's | Ministry of Infrastructure Development | Verdan Stafford | $ 200,193.00 |
Construction of concrete pavement, drains and retaining wall at Bellevue, St. George | Ministry of Infrastructure Development | Rodney Thomas | $ 699,684.70 |
Renovation of Cedars Home, St.Patrick's | Ministry of Infrastructure Development | Lewis Douglas | $ 379,630.59 |
Repair works on Telescope Primary school | Ministry of Infrastructure Development | Anderson Williams | $ 123,694.30 |
Construction of Upper Cocoa Road, Marian, St. George's | Ministry of Infrastructure Development | Ray Charles | $ 181,371.23 |
Land Liaison Consultant for the Grenada Geothermal Project | Randolph Nicholson | $ 54,555.00 | |
Procurement of pipe and pipe fittings for G-CREWS Project | National Water and Sewage Authority | PAM/Saint Gobain Uk | $ 4,455,291.32 |
Resurfacing of pavement at the Grenville Port | Grenada Ports Authority | Sonrise Construction | $ 147,518.64 |
Renovation works on the Hillsborough Government School | Ministry of Infrastructure Development | Darvon Baptiste | $ 547,002.01 |
Repair works on the Marquis Pre-Primary School | Ministry of Infrastructure Development | Brian Jeremiah | $ 178,944.00 |
Repair works on Harvey Vale Primary School | Ministry of Infrastructure Development | Kenneth Brathwaite | $ 299,818.36 |
Preparation of a feasibilty study and design for Disaster Resilience in Medical centers | National Water and Sewage Authority | SAFED Inc. | $ 109,363.06 |
Procurement of promotional materials | Ministry of Health | Positive Promotion USA | $ 58,069.66 |
Construction of temporary structure to house the school - St. Andrews Anglican Primary School | Ministry of Infrastructure Development | Neville Matthews | $ 688,173.00 |
Renovation works on Petite Martinique R.C (Additional works) | Ministry of Infrastructure Development | Mikey Bethel | $ 372,423.59 |
Repair works on Battle hill Pre-School | Ministry of Infrastructure Development | Henry Shears | $ 154,159.08 |
Repair works on Home Management Section at the Grenville Secondary School | Ministry of Infrastructure Development | Radix Nancoo | $ 126,609.56 |
Repair works on the St.Paul's Government School | Ministry of Infrastructure Development | Sonrise Construction | $ 138,898.64 |
Repair work on classroom and toilet facilities at the St. Paul's Government School | Ministry of Infrastructure Development | Sonrise Construction | $ 347,361.30 |
Repair works on River Sallee Government School | Ministry of Infrastructure Development | Niko Williams | $ 407,859.84 |
Repair works on Grenville Secondary School | Ministry of Infrastructure Development | Brian Jeremiah | $ 564,828.00 |
Supply and Installation of Aluminum windows and doors | Ministry of Health | M&N hardware Ltd | $ 328,337.12 |
Repair works at the St. Paul's Police Station | Ministry of Infrastructure Development | Phillip Clarke | $ 450,901.38 |
Rehabilitation works on Old Road, Calliste, St. George | Ministry of Infrastructure Development | Alister James | $ 166,899.25 |
Provision of social and environmental services regarding 2 schools under GEEP | Ministry of Education and Human Resources | Candice Ramessar | $ 290,164.92 |